- The Documents Required for availing the services/Needed Compliances
- Consent/Authorization/Registrations Granted by MPPCB (as applicable)
- Consent to Establish (under Water Act 1974 & Air Act 1981).
- Consent to Operate (under Water Act 1974 & Air Act 1981).
- Authorization under Hazardous Waste Rules 2016.
- Authorization under Bio-Medical Waste Management Rule, 2016.
- Authorization under Plastic Waste Management (Second Amendment) Rules, 2022.(Apply in EPR Portal https://eprplastic.cpcb.gov.in)
- Authorization under E-Waste (Management) Rules, 2022.(Apply in EPR Portal https://eprewastecpcb.in)
- Authorization under Solid Waste Management Rules, 2016.
- Authorization under C&D Waste Management Rules, 2016.
- Registration of Battery Waste Management Rules, 2022.(Apply in EPR Portal http://www.eprbatterycpcb.in)
- Consent to Establish (CTE) under Water Act 1974 & Air Act 1981.
- Land allotment letter/land allotment LOI/Land possession documents.
- Layout plan of the project/industry.
- Project report including complete details of manufacturing process with material balance / Raw Materials.
- Proposed Gross capital investment in Land/Building & Plant/machinery etc/Project cost (Fixed assets)/Self Certificate.
- NOC of Gram Sabha / Local body.
- Article of Association memorandum of under standing .
- Copy of Environmental Clearance (If any)
- DIC / SIA / DGTD / Udyam Aadhaar / Mining lease / Conceptual Plan (In case of Building /Infrastructure project) etc.
- Satellite imagery of project / industry site.
- Proposal of Effluent/Sewage Treatment Plant
- Detailed Design Drawing (Technical Report ) of ETP/STP
- Permission of CGWA (If applicable)
- Proposal along with Technical Specification of Air Pollution Control Arrangements.
- Schematic Diagram of Monitoring Facility (Port Hole & Plate form with Spiral ladder).
- List of Chemicals/ auxillary chemicals consumption per month.
- List of proposed hazardous waste generation (if any)
- Consent to Operate & Renewal of Consent (CTO/Renewal) under Water Act 1974 & Air Act 1981.
- Point wise compliance of conditions given in letter of CTE/CTO along with photographs
- Latest CA Certificate/ audited balace sheet showing actual gross capital investment (Fixed assets) in Land, Building & plant/machinery etc (without depreciation)
- Technical Details of ETP/STP installed along with photographs
- Technical Details of Air Pollution Control Measures installed along with photographs
- Copy of Environmental Clearance (If any) with compliance of conditions
- Environmental statement (In case of renewal/Expansion).
- Annual Return of Hazardous waste in Form-4
- Latest Treated waste water analysis reports (In case of renewal/ Expansion)
- Latest Emission analysis reports (In case of renewal/ Expansion).
- Authorization under Hazardous Waste Rules 2016.
- Annual Return of Hazardous waste in Form-4 (In case of renewal/expansion) along with Manifest (Form-10)
- List of hazardous waste generation along with category & quantity
- Point wise compliance of authorizations conditions (In case of renewal/Expansion)
- Details of SLF/Incinerator (If applicable)
- Authorization under Bio-Medical Waste Management Rule, 2016.
- Technical Report on ETP/STP.
- Point wise compliance of authorizations conditions (In case of renewal/Expansion)
- Form – 4 (Annual Report) (In case of renewal/Expansion)
- Membership certificate of CBWTF
- Documents Required for Registration under Plastic Waste Management (Second Amendment) Rules, 2022
- The services are provided by CPCB, for more details click here
- Documents Required for Authorization under E-Waste (Management) Rules, 2022
- The services are provided by CPCB, for more details click here
- Documents Required for Authorization under Solid Waste Management Rules, 2016
- Technical report on Segregation, collection, transportation of MSW.
- Technical report on processing/treatment of Wet wastes/Dry wastes/Domestic HW.
- Point wise compliance of authorizations conditions (In case of renewal/Expansion)
- Form – 4 (Annual Report)
- Documents Required for Authorization under Construction & Demolition waste Management Rules 2016
- Technical report on Collection, Storage, Processing or recycling facilities for C&D waste.
- Point wise compliance of authorizations conditions (In case of renewal/Expansion)
- Form – 2 (Annual Report)
- Documents Required for Registration under Battery Waste Management Rules, 2022.
- The services are provided by CPCB, for more details click here
Disclaimer: The Procedure/Required list of document for Registration, Licenses, Renewals and Verifications is same irrespective of Risk category, Size of firm, business location and Foreign/ Domestic investor.